HZ-20 Type Highway Guardrail Core Drill Bit
HZ-20 Type Highway Guardrail Core Drill Bit
HZ-20 Type Highway Guardrail Core Drill Bit
HZ-20 Type Highway Guardrail Core Drill Bit
+
  • HZ-20 Type Highway Guardrail Core Drill Bit
  • HZ-20 Type Highway Guardrail Core Drill Bit
  • HZ-20 Type Highway Guardrail Core Drill Bit
  • HZ-20 Type Highway Guardrail Core Drill Bit

HZ-20 Type Highway Guardrail Core Drill Bit

Drill bit specifications for concrete core drilling machines: φ50 drill bit φ100 drill bit φ127 drill bit φ150 drill bit φ200 drill bit Available heights: 400/500/600/700 mm; with male or female threads (custom shapes available)

WhatsApp phone:

Keywords:

  • Product Description
  • Concrete core drilling machine bit specifications:

    φ50 drill bit
    φ100 drill bit
    φ127 drill bit
    φ150 drill bit
    φ200 drill bit
    Available heights: 400/500/600/700 mm, with male and female threads (custom shapes available).

Reasons to Choose Us

Multiple specifications to choose from

Source factory

Ships promptly

Thoughtful service

Supports customization

Selected Raw Materials

Factory Advantages

Deep expertise, comprehensive product range

Deep expertise, comprehensive product range

Over 10 years of dedicated R&D and manufacturing of testing instruments for highway, construction, geotechnical, asphalt, cement, and other engineering applications.
Comprehensive category coverage: from raw material testing to construction quality control, a one-stop solution.
Compliant with international standards such as ISO and GB, meeting the regulatory requirements of overseas projects.

Customized Solutions

Reliable quality and excellent value for money.

We strictly adhere to the ISO 9001 quality management system, select core components from internationally renowned brands, and conduct full inspection before shipment.
In-house manufacturing + a large-scale supply chain deliver strong price competitiveness, with no markups from intermediaries.
Stable and durable, with a low failure rate, reducing operational and maintenance costs for overseas customers.

Efficient delivery, global service

Efficient delivery, global service

In-stock inventory plus flexible manufacturing ensures 7–15 day rapid delivery, with support for customized rush orders.
Cangzhou’s Lin’gang District boasts a strategic location, with convenient sea and air transportation and globally traceable logistics.
Multilingual team with 24-hour technical support, offering installation and commissioning, training, a three‑year warranty, and ongoing follow-up services.

Operating with integrity and backed by extensive experience.

Operating with integrity and backed by extensive experience.

13 years of industry expertise, serving over 30 countries and regions worldwide.
The principle of “integrity in business, mutual benefit.”
Deep understanding of international engineering standards and procurement processes, with efficient communication and seamless collaboration.

Frequently Asked Questions

Is the universal materials testing machine experiencing loading stalling or abnormal zeroing of load data?


1. Loading lag: Clean the lead screw and guide rails, apply lubricant, and remove debris from the transmission components. 2. Zeroing anomaly: Restart the equipment system, calibrate the load and displacement zero points, and check for poor electrical contact in the sensor wiring. 3. Overloading is strictly prohibited; before testing, verify that the grips are securely tightened to prevent eccentric loading of the specimen.

How often should in‑instrument verification be performed? Which instruments are required to undergo it?


High‑precision, high‑frequency‑use, and drift‑prone equipment (such as balances, penetration testers, water permeability testers, and sensor‑type devices) shall undergo intermediate verification every three months; routine equipment shall be verified every six months. Equipment that is within the verification/calibration interval, has been repaired following a malfunction, or has been relocated must undergo additional intermediate verification, with complete verification records maintained.

Is the repeatability of pendulum-type pavement friction coefficient measurements poor?


Key points for resolution: Prior to testing, thoroughly clean the pavement at each measurement point, ensuring there is no standing water, dust, or debris; calibrate the instrument’s level and zero point to ensure a standardized pendulum‑drop trajectory; strictly control the pendulum’s sliding distance; avoid conditions such as strong winds, wet pavement, or abrupt temperature changes; and calculate the average of multiple measurements taken at the same point.

How should one handle cases where the pavement infiltration meter data exceeds allowable error limits, exhibits leakage, or shows abnormal readings?


1. Sealing leaks: Inspect the base seal for aging or damage and replace it promptly; before testing, firmly press down on the base to expel any residual air inside. 2. Data deviation > ±2%: Calibrate the level sensor, clean any fouling from the graduated cylinder, and check for damage to the scale markings. 3. Compliance with new regulations: For seepage rates ≤ 300 mL/min, existing equipment may continue to be used; for rates > 300 mL/min, the accuracy of older equipment fails to meet standards, and such equipment must not be used.

Can the old Marshall compaction apparatus and stability tester still be used?


According to the 2025 revised asphalt testing procedures, after adjusting the indenter configuration on the Marshall stability test apparatus, existing instruments currently in use may continue to be operated normally without mandatory replacement; only periodic calibration to maintain accuracy and ensure equipment integrity is required.

What are the causes of uneven compaction and layered cracking in molded specimens during compaction testing?


Main causes: non‑vertical drop of the compaction hammer, rail jamming, excessive deviation in hammer weight, uneven layer thickness during loading, insufficient number of blows, or overload. Solutions: regularly lubricate the guide rails; verify and correct the vertical alignment of the hammer; strictly follow the procedure for layered material placement and step‑by‑step compaction; ensure that hammer weight and drop height comply with standards; and prevent over‑thick layers.

Get more product information for free

*Note: Please provide accurate information and keep your communication channels open. We will contact you as soon as possible.

Submit Now

Related products

Content update in progress,...

Request a quote now

We will contact you within one business day. Please check your email.

Submit